Employer Ledger

States › Maryland › Specialty Trade Contractors

Galeano Construction LLC

Westminster, Maryland · NAICS 238130 · 9 federal records

OSHA: 9 insp.Injuries: no recordLabor: no recordImmigration: no recordContracts: not listed

Across the sources on this site, Galeano Construction LLC (Westminster, Maryland) appears in 9 OSHA inspections.

OSHA opened 9 inspections at Galeano Construction LLC sites in Maryland since 2016, issuing 55 citations, 34 of them classified serious, willful or repeat. Current penalties total $40,214 (initially $45,637), $4,468 per inspection, close to the national figure of $3,754. No citation is recorded as contested.

OSHA Occupational Safety and Health Administration

Citations may be contested; the status shown reflects the record at the data date. Enforcement data through 14 Sep 2026.

9inspections since 2016
55citations issued34 serious, willful or repeat
$40Kcurrent penaltiesinitial $46K
0inspections with a contested citation8 with final orders on all

Inspections by year

201620172018201920222024
Inspections opened per year; 2016: 4 citations, $331 · 2017: 12 citations, $10K · 2018: 12 citations, $1,448 · 2019: 4 citations, $3,435 · 2022: 6 citations, $10K · 2024: 17 citations, $15K.

Compared with industry, state and nation

MeasureThis employerNAICS 238MarylandUS
Citations per inspection6.12.04.11.9
Current penalty per inspection$4,468$4,555$2,307$3,754
Share of inspections with a contested citation0%—5%8%
Share of inspections with final orders on every citation89%—73%56%

Inspections with no citations count as "issued" with zero citations. Industry and state figures cover every inspection in the enforcement data since 2016, including employers without a page.

Citations by standard

StandardSubjectCitations
1926.503Training requirements (fall protection)7
1926.501Duty to have fall protection7
1926.1053Ladders6
1910.1200Hazard communication6
1926.20General safety and health provisions5
1910.178Powered industrial trucks3
1926.102Eye and face protection3
1926.405Wiring methods, components and equipment for general use3
1926.502Fall protection systems criteria and practices2
1926.1060Training requirements (stairways and ladders)2
1926.302Power-operated hand tools2
1926.416General requirements (electrical safety-related work practices)2

Standard numbers as the record labels them (29 CFR section; 5(a)(1) is the General Duty Clause). State-plan agencies such as Cal/OSHA cite their own codes, which appear here as recorded. Counted from the first twelve citations of each inspection.

Inspections

OpenedTypeScopeCitationsCurrent penaltyStatusCited standards
18 Jun 2024Planned · SafetyComplete17 (11 S/W/R)$14,600Final order1910.178(l)(1)(i) (Serious), 1926.20(b)(1) (Serious), 1926.502(i)(3) (Serious), 1926.502(i)(4) (Serious), 1926.503(a)(2)(ii) (Serious), 1926.1053(b)(1) (Serious) … +11
6 Jan 2022Programmed related · SafetyComplete6 (4 S/W/R)$10,000Final order1926.20(b)(2) (Serious), 1926.1051(a) (Serious), 1926.102(a)(1) (Repeat), 1926.501(b)(13) (Repeat), 1926.503(a)(1), 1926.503(b)(1)
23 Apr 2019Planned · SafetyComplete4 (4 S/W/R)$3,435Final order1926.102(a)(1) (Repeat), 1926.302(b)(3) (Serious), 1926.405(j)(1) (Serious), 1926.501(b)(13) (Serious)
14 Dec 2018Planned · SafetyComplete1 (1 S/W/R)$180Final order1926.501(b)(13) (Serious)
6 Dec 2018Planned · SafetyComplete7 (2 S/W/R)$668Final order1926.302(b)(3) (Serious), 1926.1053(b)(13) (Repeat), 1910.1200(e)(1), 1910.1200(g)(8), 1910.1200(h)(1), 1926.405(g)(2)(iv) … +1
3 Jul 2018Planned · SafetyComplete0—Case closed
8 Jun 2018Planned · SafetyComplete4 (2 S/W/R)$600Final order1926.501(b)(13) (Serious), 1926.503(b)(1) (Repeat), 1910.178(l)(6), 1926.405(g)(2)(iv)
22 Sep 2017Planned · SafetyComplete12 (9 S/W/R)$10,400Final order1926.20(b)(1) (Serious), 1926.20(b)(2) (Serious), 1926.102(a)(1) (Serious), 1926.416(e)(1) (Serious), 1926.1060(a) (Serious), 1926.501(b)(13) (Repeat) … +6
30 Aug 2016Planned · SafetyComplete4 (1 S/W/R)$331Final order1926.501(b)(13) (Serious), 1926.503(b)(1), 1926.1053(b)(1), 1926.1053(b)(13)

Status is per inspection: "Contested" when any citation has a contest date and "Final order" when every citation has a final order date; "Issued" otherwise. Violation types: S serious, W willful, R repeat. Each date links to the inspection detail on osha.gov.

Injuries OSHA Injury Tracking Application, Form 300A

Establishments submit their own Form 300A summaries; OSHA publishes the data as submitted and does not verify it. Rates are per 100 full-time workers (cases × 200,000 ÷ hours worked). Calendar years 2023–2025.

No Form 300A summary for this employer in Maryland is in the Injury Tracking Application data for 2023, 2024, 2025. Only establishments in covered industries with 20 or more employees (100 or more in some industries) must submit.

Labor Wage and Hour Division

The Wage and Hour Division publishes concluded compliance actions since fiscal year 2005; amounts are back wages the employer agreed to pay and civil money penalties assessed, as recorded at case conclusion. Data through 15 Jun 2026.

No concluded Wage and Hour Division compliance action names this employer in Maryland in the data since fiscal year 2005.

Immigration Office of Foreign Labor Certification

Employer-specific case information was provided to OFLC by employers who submitted foreign labor certification applications. These are not employer responses to the Bureau of Labor Statistics' survey. Wage levels I–IV are as the employer stated on the application. LCA data through 30 Jun 2026; PERM through 30 Jun 2026.

No labor condition application from this employer in Maryland appears in OFLC disclosure data for fiscal years 2025–2026.

No PERM application from this employer appears in the fiscal years covered.

Contracts USAspending.gov

USAspending recipient totals are federal contract obligations reported by awarding agencies for the latest twelve months; a recipient profile is a company-level record, not a per-state one. Retrieved 1 Oct 2026.

Not among the top 3,903 federal contract recipients loaded from USAspending for the latest twelve months. Smaller awards can be searched on USAspending.gov.

Questions and answers

Has OSHA inspected Galeano Construction LLC?

Yes. OSHA records 9 inspections at Galeano Construction LLC sites in Maryland since 2016, most recently opened 18 Jun 2024.

Were there penalties, and are they final?

55 citations with current penalties totalling $40,214. 8 inspections have a final order on every citation, 0 have a contested citation and 1 is recorded as issued. Citations may be contested; the status shown reflects the record at the data date.

Did the Labor Department find back wages due from Galeano Construction LLC?

No concluded Wage and Hour Division compliance action names Galeano Construction LLC in Maryland in the data since fiscal year 2005.

Does Galeano Construction LLC sponsor H-1B workers, and at what wages?

No labor condition application from Galeano Construction LLC in Maryland appears in OFLC disclosure data for fiscal years 2025–2026. LCAs are filed by the employer's headquarters state, so a subsidiary or another state's entity may hold the filings.

Does Galeano Construction LLC sponsor green cards (PERM)?

No PERM application from the employer appears in the fiscal years covered.

Does Galeano Construction LLC hold federal contracts?

It is not among the top federal contract recipients loaded from USAspending; smaller awards are not covered on this site.

Have there been union elections at Galeano Construction LLC?

NLRB election results are not loaded on this site at present, so this page cannot say either way. The NLRB publishes recent election results and a case search on nlrb.gov.

Is this the same company as the one I am looking for?

Records are matched by normalised name and state. Subsidiaries, franchisees and other states' entities have their own records. See the methodology for how matching works.

Provenance

OSHA inspections and violations: US Department of Labor enforcement data, data.dol.gov, through 14 Sep 2026, inspections opened since 2016. Injury summaries: OSHA Injury Tracking Application Form 300A data, calendar years 2023, 2024, 2025. Wage and Hour compliance actions: data.dol.gov, concluded cases through 15 Jun 2026. LCA and PERM: OFLC disclosure files, fiscal years 2025–2026 through 30 Jun 2026. Federal contracts: USAspending recipient API, latest twelve months at 1 Oct 2026. NLRB election results are not loaded in this build. US government works, public domain; USAspending data is released under CC0. Page built 1 Oct 2026; errors in processing are corrected at the next build (corrections). Disputes about a record go to the agency that holds it.